Sunday, May 15, 2011

#17 Fairway


#17 Fairway

     Our efforts with drainage are shown here.  The work on the left side of the fairway as you look toward the tee is nearly dry while the right side is saturated after 1.5 inches of rain since Thursday.  Jesus and I prepared the area for another drain line that we'll install on Monday.

No comments:

Post a Comment